Skip to main content

BPA Technology Innovation Project Brief. This project will deploy 300 electric resistance and 300 heat pump CEA 2045 controlled water heaters in the Pacific Northwest (PNW), and execute demand response event use cases over a 12 month period.

Prepared by:  Bonneville Power Administration

Published:  September 2015

Tech Resource Type
Field Studies