BPA Technology Innovation Project Brief. This project will deploy 300 electric resistance and 300 heat pump CEA 2045 controlled water heaters in the Pacific Northwest (PNW), and execute demand response event use cases over a 12 month period.
Prepared by: Bonneville Power Administration
Published: September 2015
Tech Resource Type
Field Studies