This summary from a Better Buildings Residential Network peer exchange call focused on approaches to generate demand for energy efficiency upgrades at multifamily buildings.
Showing results 1 - 9 of 9
The multifamily sector can be hard to reach when it comes to energy efficiency programs. Besides being diverse and complex, the sector presents a unique set of challenges to efficiency investments. The result is that multifamily customers are often underserved by energy efficiency programs. Drawing on data requests and interviews with program administrators, this report summarizes the challenges to program participation and identifies best practices that programs can use to reach and retain large numbers of multifamily participants.
This document summarizes top marketing and outreach takeaways shared by Better Buildings Residential Network members during spring 2015 Peer Exchange Calls.
This report explores the approaches and research needs identified in the Building Retrofit Industry and Market (BRIM) Initiative through in-depth discussion with residential energy upgrade experts including a discussion of Marketing & Outreach and the program/contractor interface.
This publication summarizes some of the incentives offered by Better Buildings Neighborhood Program partners.
This guide provides background on the home improvement market in the U.S. and Canada and end users and systems in existing homes, as well as a description of energy efficiency program approaches and strategies.
This Technical Reference Manual (TRM) defines the consensus calculations of the electric and natural gas energy savings and the electric demand reductions, achieved from installing energy efficiency and renewable energy measures that are supported by Focus on Energy programs.
Ivy Knoll Senior Retirement Community used PACE financing to make significant building improvements of systems that were outdated or energy inefficient. Through PACE financing, Ivy Knoll management was able to select improvements that had the highest energy savings but also came with higher upfront costs for the 7-story, all-electric building.